Utility-scale site screening
Utility-scale solar projects commit large sums to land, interconnection and permitting, so early site selection matters. Acrelume speeds up the first stages of the development funnel: finding regions and parcels with a strong resource, a reachable transmission line and no obvious flood risk.
Where Acrelume fits in the funnel
- Region screening: compare solar resource across areas
- Site identification: find parcels near suitable transmission lines
- First screen of each site: solar, grid and flood checks with a verdict
- Feasibility study: detailed engineering, interconnection study, environmental review
- Development: land control, permits, financing, interconnection agreement
Acrelume covers stages 1 to 3, so only the strongest sites move on to costly feasibility work.
Transmission matters most
For large projects, the distance and voltage of the nearest transmission line often decide the economics. Acrelume shows both for every site, and the map can show transmission lines by voltage across a whole region. New transmission can cost millions of dollars per mile, so a site 2 km from a 230 kV line is in a very different position from one 20 km away. A nearby line does not guarantee capacity; check the utility's queue and hosting capacity data.
Solar resource
As a rough guide, a daily GHI above 5.5 kWh/m² is a high-value resource, and the average new US utility-scale solar farm built in 2025 sits around 4.7 (Berkeley Lab). Plenty of projects are built well below that where power prices and state programmes support them; Site Studio shows how a site compares with the state's operating solar farms. For a large parcel, screen several points across it to see how much the resource varies.
Flood risk
Large sites often include low ground. Acrelume flags sites inside FEMA high-risk zones and shows the distance to the nearest one, so you can see early whether part of a parcel may be unusable.
Screening many sites
Use AI Portfolio Insights to rank saved sites, or connect an AI agent or the API to screen up to 25 sites per request. See AI Agents and API.
Next steps for strong sites
- Interconnection pre-application with the utility or grid operator
- Land option or lease negotiation
- Phase I environmental site assessment and a flood survey
- Detailed energy modeling (for example PVsyst)