Understanding Your Results

Last updated: November 20, 2026

Understanding your screening results

Each screened US site gets the solar, grid and flood checks, eight land and grid checks, and a verdict. This page explains what each value means and how the verdict is decided.

Solar resource (GHI)

Global horizontal irradiance (GHI) is the average solar energy reaching a flat surface, in kWh/m² per day. It is the standard first measure of a site's solar resource.

Solar is built across the whole US, not only where it is sunniest: Illinois, New York, Minnesota and Massachusetts have hundreds of operating solar farms at 3.6–4.2. So Acrelume rates a site against operating solar farms in the same state (from the USGS/LBNL U.S. Large-Scale Solar Photovoltaic Database, with NREL sunlight at each farm):

  • 5 or more: strong (green)
  • At least as sunny as the least sunny 10% of the state's solar farms: typical for that state's solar, e.g. "typical for Illinois solar" (green)
  • Below that: low for that state's solar (amber, a thing to check)
  • States with few solar farms: 4 or more is typical of US solar sites (green), below 4 is below most US solar sites (amber)

Low sunlight alone is never a deal-breaker (red). It means fewer kWh per panel, which state programmes and power prices often make up for. The number is always shown, so you can compare sites directly.

For reference, the US Southwest is around 5.5–6.5, the Southeast and Mountain West around 4.5–5.5, and the Midwest and Northeast around 3.5–4.5. Site Studio also shows the monthly pattern, so you can see how much the resource drops in winter.

DNI (direct normal irradiance) is the direct beam from the sun; it matters most for tracking systems. DHI (diffuse horizontal irradiance) is scattered light from the whole sky; it is a larger share of GHI in cloudy and humid places.

Grid: nearest transmission line

Acrelume finds the nearest transmission line and shows its distance and voltage.

  • 5 km (about 3 miles) or closer: good
  • 5 to 15 km: worth checking
  • more than 15 km: a long, costly connection, flagged red

If you enter a project size (MW AC), the thresholds follow the size: under 5 MW the line is context only, because small projects usually connect to the distribution grid; larger projects look at lines of a matching voltage, with wider distances for bigger projects. How Screening Works has the numbers.

A nearby line does not mean it has capacity for your project. Confirm interconnection capacity with the utility.

Flood: FEMA high-risk zones

Acrelume checks the FEMA National Flood Hazard Layer at the site.

  • Inside a high-risk zone (zones starting with A or V, the Special Flood Hazard Area): flagged as a possible deal-breaker
  • Outside: the card shows the distance to the nearest high-risk zone, or that none is nearby

Low-risk zones such as X are not flagged. A flood survey is still needed before you commit to a site.

Land and grid checks

  • Wetlands (USFWS National Wetlands Inventory): inside a mapped wetland is a possible deal-breaker; one within 250 m is worth checking. The map is not a delineation; a delineation decides.
  • Land cover (USGS Annual NLCD, 30 m, 2025): what is on the land at the pin and the mix in a square of about 300 m. For ground-mount solar, built-up land, open water or ice is a possible deal-breaker; lightly developed land, forest or wetland cover is worth checking; farmland, grassland, shrub or barren land is clear. Satellite land cover can lag recent construction or clearing.
  • Protected land (USGS PAD-US 4.1, USFWS critical habitat): inside a park, wilderness, refuge, conservation easement or final critical habitat is a possible deal-breaker; public land such as BLM land, proposed critical habitat or strictly protected land within 1 km is worth checking.
  • Slope (USGS 3DEP): more than half of the area around the pin steeper than 15% grade is a possible deal-breaker; more than 20% steeper than 10% is worth checking.
  • Prime farmland (USDA soils): worth checking, never a deal-breaker.
  • Nearest substation (OpenStreetMap), grid queue in the county (LBNL Queued Up, transmission queues only) and electric utility (HIFLD service territories): context for the grid connection, never a deal-breaker.

How Screening Works has the exact rules and Data Sources the data years.

The verdict

The verdict is one line about the checks: how many are red flags, how many are worth a look and how many are clear.

  • No red flags · 11 checks clear: every check is green
  • No red flags · 2 to look at · 8 clear: no check is red, one or more are amber
  • 1 red flag · 1 to look at · 9 clear: at least one check is red. A red flag is a possible deal-breaker; hover the verdict (or read the PDF report) to see which check it is.
  • · 1 unavailable: a data source did not answer for this site, so that check could not run. A check whose source did not answer is never counted as clear. Outside the US, the transmission, flood, land and grid checks are marked unavailable rather than guessed.

Below the verdict the card also lists what is not checked: zoning, parcels and hosting capacity.

Screening for

The Screening for menu at the top of Site Studio says what you plan to build: ground-mount solar (the default), rooftop or carport solar, battery storage, a data center, an EV fleet or truck charging hub, or land for a solar lease (the landowner's or broker's view). The checks are the same; how each one counts in the verdict follows the choice. For example, built-up land is expected for rooftop solar, and a check that does not apply to a use case is shown greyed as "not used" instead of counting as clear.

The verdict is a first screen to decide which sites deserve a closer look. It is not a substitute for a utility interconnection study, a wetland delineation, a flood survey or detailed design.

Other terms

Peak sun hours, capacity factor and other terms are explained in the Solar Glossary.